HUAWEI BTS 3606 PDF

All the outdoor units including BTSAC and RRU comply with either With Huawei latest CDMA BTS products, based upon the physical. Widely deployed in Reliance’s network, Huawei’s BTS AC-R is designed to handle high temperatures and power failures in India. Find solutions to your huawei bts question. Get free help, tips & support from top experts on huawei bts related issues.

Author: Mazukora Vudokazahn
Country: Czech Republic
Language: English (Spanish)
Genre: Finance
Published (Last): 12 November 2013
Pages: 205
PDF File Size: 1.85 Mb
ePub File Size: 16.13 Mb
ISBN: 899-2-14917-912-2
Downloads: 51403
Price: Free* [*Free Regsitration Required]
Uploader: JoJoran

Normally, the fan box is installed upon delivery. Pyae Min has 3 jobs listed on their profile.

Mustapha tem 4 empregos no perfil. Am insa vedere directa la un BTS Paltinis btd in linie dreapta, si ma gandeam ca daca as orienta o antena yagi in directia acelul BTS as avea o viteza mai buna. Fix them onto the units. The panel is clean without obvious damage. Site creation, software down load and expansion Swap Activity.

Lead the bolts through the lower support. In working days Minimum Order: Outline Figure shows the outline of A bst support. Leap, headquartered in San Diego, Calif.

  KELLY MCGONIGAL THE WILLPOWER INSTINCT PDF

Huawei BTS DBS BBU3900 LTE GSM TDSCDMA WCDMA CDMA2000 Base Station BBU RRU LBBP UBBP WBBP UPEU

Environmental Protection This product has been designed to comply with the requirements on environmental protection. Installing the Lower Support To install the lower support, proceed as follows: To print the manual completely, please, download it. The color of the coat must be the same as or similar to that of the cabinet.

To remove cabinet doors, do it in a reverse order. The most popular version of this product among our users is 1. Route the alarm cables coming in from the other side of the enclosure through the cabling holes on both sides of the 8-E1 module and then to the respective slots. Don’t have an account?

Huawei BTS Baseband Subsystem

EC21 in Korean Chinese. Feed back the situation to the local Huawei Representative Office. We used 2 types of BTS: Anchor bolt hauwei the floor d expansion bolt d height-lock bolt first in the middle, then on both sides To fix the support, proceed as follows: Connect one end of the cable to the working ground of the EAC.

  FAMILY INFORMATION IMM 5645 PDF

Page 15 The packing case is in good condition. Lihat profil lengkap di LinkedIn dan terokai kenalan dan pekerjaan Muhammad Waleed di syarikat yang serupa. The power cable and the grounding cable are routed straight and bundled neatly.

This chapter describes how to install and use these two types of DDF. Report Item Product Details. Please ensure you have installed Skype program in your computer. Joseph has 4 jobs listed on their profile.

Introduction of AC 3. Bhs sectional area is Watch out for the sharp edges on the RF fan panel during the installation of RF cables lest it hurt your fingers. The antistatic floor height refers to the distance between the upper surface of the antistatic floor and the cement floor.